Move the full environment to Cloud within a planned migration window.
- End-to-end migration support
- Data validation and reconciliation
- Post-migration optimization
Loading Clovity



Atlassian Data Center is approaching end of life. Waiting doesn’t remove the need to migrate - it reduces your planning window and can turn a controlled program into a rushed transition.
We manage migration as a staged, validated program - not a single weekend cutover - so app compatibility, permissions, integrations and critical workflows are tested before production cutover.

Three real migration strategies. Which one fits depends on the size and complexity of what you’re moving.
Move the full environment to Cloud within a planned migration window.
Move in stages, validating each wave before the next for greater control and reduced risk.
Operate Cloud and Data Center in parallel during migration, with a defined path to Cloud before Data Center end of life.
The same three issues stall almost every Data Center migration - so they get dealt with first, not discovered mid-cutover.
Years of installed apps, scripts and integrations get checked against a Cloud equivalent before a cutover date is ever set - not discovered missing once one has been.
Cloud’s permission model is different enough that copying schemes over as-is usually produces over-permissioned projects or broken workflows. We rebuild the model deliberately instead.
The source Data Center environment stays administered and available until a wave is signed off, so rollback is a real option - not a hope - if something in Cloud doesn’t hold up.
We assess your current environment
Create a secure migration roadmap
Execute in phased, zero-downtime waves
Validate, test and ensure quality
The same migration program, run to the compliance baseline federal and state agencies require - built on the readiness process we already run for public-sector clients.
Standard Atlassian Cloud - the right destination for most teams: faster releases, no infrastructure to patch and every new Atlassian feature on day one.
Multi-region infrastructure with automatic failover, no single point of failure.
SOC 2, ISO 27001 and GDPR compliance, managed by Atlassian.
Continuous feature releases and platform upgrades, with no manual work on your side.
AGC is Atlassian’s FedRAMP Moderate authorized environment for Jira, Jira Service Management and Confluence, designed for U.S. government agencies and eligible partners.FedRAMP High and Impact Level 5 (IL5) remain on Atlassian’s roadmap.
Environment assessment, app compatibility, compliance mapping and total cost analysis.
Permission models, data flows and FedRAMP-aligned configuration baselines.
Move from Data Center to AGC in controlled phases with validation at every stage.
Ongoing platform health checks, administration and support.
Data Center is the most common starting point, but we’ve also moved teams off Cherwell, BMC Remedy, ServiceNow and YouTrack onto the Atlassian suite - see the migration sources above.
That’s the reason we default to phased waves instead of a single cutover window - each wave is validated and has its own rollback point, so a problem in one wave doesn’t take down the rest of the instance.
Every installed app is checked for a Cloud-compatible version before migration and remediated where one doesn’t exist yet - the first of the guardrails above.
Yes - the AGC path above runs the same migration program to the FedRAMP-aligned baseline federal and state agencies require.
You can take it from there or hand ongoing administration to our Managed Services team, with Pulse AI watching instance health from day one after go-live.
A written picture of what you are moving: an inventory of projects, spaces and users, every installed app checked against its Cloud availability, the configuration that will not survive the move as-is and the wave plan that falls out of all three. That document is what a date and a cost come from - which is why we would rather give you it than quote a timeline before anyone has looked inside the instance.
Data Center and server estates moved to Cloud and Government Cloud, in the clients’ own words.

EDD partnered with Clovity to execute a comprehensive data migration and ongoing platform support engagement, moving from legacy systems to modern Atlassian infrastructure…
Read the case study
In today’s fast-evolving digital landscape, enterprises require tools that are flexible, scalable, and seamlessly integrated to drive efficiency and innovation. The migration from…
Read the case study
Forcepoint, a global leader in cybersecurity, faced challenges in managing its on-premises Jira infrastructure. As business needs evolved, their existing Jira Data Center setup…
Read the case studyTell us what you’re working on and a Clovity specialist will get back to you with next steps.